Thanks Bobby. I have been taking the time to add all the little details that make all the difference. Machining billet ends for the foot pegs and stem base, etc. Most builders would leave them open or weld a washer/nut combo on the end for pipe mounts. If I cant build a premium product, I dont want to bother.