It depends on the humidity of your area, and it needs to be stored up off the concrete, but here in dry ca., I would call it bad after about 6 mos. If you really want to get technical about it you measure it with a hydrometer.
QUOTE (REDLINE @ Jun 7 2008, 06:05 PM) index.php?act=findpost&pid=2137It depends on the humidity of your area, and it needs to be stored up off the concrete, but here in dry ca., I would call it bad after about 6 mos. If you really want to get technical about it you measure it with a hydrometer.
no not trying to get technical just a ballpark time. It is very humid here in Va. I was wondering if like 2-3 months? or 4-6 weeks? or what. better yet how can you tell on alky? does it turn color or anything or getting white strings ?
This is an older thread, you may not receive a response, and could
be reviving an old thread. Please consider creating a new thread.
ATV Drag Racer Forums
A forum community dedicated to ATV owners and drag race enthusiasts. Come join the discussion about performance, modifications, classifieds, troubleshooting, maintenance, and more!